Dam

A dam is a barrier that impounds water or underground streams. Reservoirs created by dams not only suppress floods but also provide water for such activities as irrigation, human consumption, industrial use, aquaculture, and navigability. Hydropower is often used in conjunction with dams to generate electricity. A dam can also be used to collect water or for storage of water which can be evenly distributed between locations. Dams generally serve the primary purpose of retaining water, while other structures such as floodgates or levees (also known as dikes) are used to manage or prevent water flow into specific land regions.

The word dam can be traced back to Middle English, and before that, from Middle Dutch, as seen in the names of many old cities.

History

Ancient dams

Early dam building took place in Mesopotamia and the Middle East. Dams were used to control the water level, for Mesopotamia's weather affected the Tigris and Euphrates rivers, and could be quite unpredictable.

The earliest known dam is the Jawa Dam in Jordan, 100 kilometres (62 mi) northeast of the capital Amman. This gravity dam featured an originally 9-metre-high (30 ft) and 1 m-wide (3.3 ft) stone wall, supported by a 50 m-wide (160 ft) earth rampart. The structure is dated to 3000 BC.

This page contains text from Wikipedia, the Free Encyclopedia - https://wn.com/Dam

DAMS

DAMS (formerly Driot-Arnoux Motorsport, currently Driot Associés Motor Sport) is an auto racing team from France, involved in many areas of motorsport. DAMS was founded in 1988 by Jean-Paul Driot and former Formula One driver René Arnoux. It is headquartered near Le Mans, only 2 km from the Bugatti Circuit.

Notable DAMS drivers include Érik Comas, Allan McNish, Olivier Panis, Jean-Christophe Boullion, Sébastien Bourdais, Kazuki Nakajima, Romain Grosjean and Kevin Magnussen.

History

The year after its foundation, DAMS joined the International Formula 3000 Championship. They stayed in F3000 until 2001. DAMS were one of many French teams that were part of the Elf young driver sponsorship program.

Aside from F3000, DAMS planned to join the F1 World Championship in 1996, with a car (the GD-01) developed by Reynard, but lack of funds prevented the team from advancing.

DAMS enter in sports car racing since 1997 until 2002 where it helped the Michel Vaillant movie, preparing and racing cars in the 24 Hours of Le Mans.

This page contains text from Wikipedia, the Free Encyclopedia - https://wn.com/DAMS

Hydro

Hydro may refer to:

Energy technologies

  • Water-derived power or energy:
  • Hydropower, derived from water
  • Hydroelectricity, in electrical form
  • "Hydro", A(lternating)C(urrent) mains electricity in parts of Canada
  • Utilities

    Australia:

  • Snowy Hydro
  • Hydro Tasmania
  • Canada:

  • Canadian Hydro Developers (not specific to a province)
  • In Manitoba:
  • Manitoba Hydro
  • Winnipeg Hydro, Manitoba
  • In Ontario:
  • Ontario Hydro
  • Hydro One
  • Hydro Ottawa
  • Toronto Hydro
  • Specific to other provinces:
  • BC Hydro, British Columbia
  • Newfoundland and Labrador Hydro
  • Hydro-Québec
  • Europe:

  • Norsk Hydro, in Norway
  • Scottish Hydro Electric
  • Other uses

  • Hydro (fuel-station chain), in Sweden
  • SF Hydro, former Norwegian railway ferry
  • Places:

  • Hydro, Oklahoma, United States
  • Hydro, Ontario, Canada
  • Personal names:

    Hydro (fuel-station chain)

    Hydro was a chain of fuel stations throughout Sweden owned by Statoil. The chain had more than 500 stations, as well as some unmanned Uno-X stations. The company also operated in retailing natural gas, electricity and heating oil.

    History

    The Hydro chain was created in the late 1980s when Norsk Hydro bought the Mobil stations in Norway, Sweden and Denmark to transform itself to a vertically integrated petroleum company. The stations were rebranded Hydro in all three countries. In 1995 the Norwegian and Danish stations were converted to Hydro Texaco when Hydro merged its stations in the two countries with Texaco's stations. In 2007 the ownership of Hydro was transferred to StatoilHydro when Norsk Hydro's oil and gas division merged with Statoil. When StatoilHydro was renamed Statoil in November 2009, the use of the Hydro-brand was discontinued and ownership of the Hydro filling stations was transferred to St1.

    References

    External links

  • Hydro Sweden
  • List of Marvel Comics characters: H

  • 0–9
  • A
  • B
  • C
  • D
  • E
  • F
  • G
  • H
  • I
  • J
  • K
  • L
  • M
  • N
  • O
  • P
  • Q
  • R
  • S
  • T
  • U
  • V
  • W
  • X
  • Y
  • Z
  • Haazareth Three

    The Haazareth Three debuted in Fantastic Four Vol 3 #69 (2003). They operate out of the hellish realm ruled by Mephisto. They are a trio of demons with whom Doctor Doom made a pact (seen in the Unthinkable story arc). They made a deal with Doom; if he sacrifices something of irreplaceable value, they would provide him with the magical powers he would have possessed if he had chosen to devote his life to studying magic over science. Doom does, killing his childhood sweetheart, Valeria. The demons come through with the deal.

    Hack

    Hack is a mutant whose first appearance was in Excalibur vol. 2 #2. He was one of the few survivors after Cassandra Nova programmed her Wild Sentinels to decimate the island nation of Genosha, killing over 16 million mutants. He found other survivors and allied himself with Unus the Untouchable and his gang. He was a very valuable asset on the island since all forms of electronic communication were eradicated or made useless by the resulting electro-magnetic damage. Inside of the gang, he became close friends with Hub and the two of them began to doubt if Unus' exclusive, clique-like strategy was the best way. Hack was gifted with a finely tuned form of telepathy that allowed him to "hack" into almost any mind.

    Podcasts:

    PLAYLIST TIME:

    Latest News for: Hydro dams

    Edit

    Outdoor recreation economy rivals oil and gas in Canada, new report shows

    North Shore News 01 May 2025
    It's nearly on par with the oil and gas sector, which generates $139.2 billion ... Beyond GDP ... Glacier loss is another additional concern for Whistler and the Sea to Sky, as glaciers feed rivers and hydro dams crucial to both ecosystems and energy ... .
    Edit

    Power tariff may rise in summer months

    The News International 30 Apr 2025
    The likely hike in electricity rates is mainly because of less hydro generation in summer months due to lower water level in Tarbela and Mangla dams and dysfunctional Neelum-Jehlum project causing more reliance on costly thermal power generation ... .
    Edit

    Is this river alive? Robert Macfarlane on the lives, deaths and rights of our rivers

    The Observer 27 Apr 2025
    from mining, pollution and damming ... In 2021, that extraordinary river became the first in Canada to have its rights declared, as part of a campaign to save it from death by drowning at the hands of a planned multi-dam hydro development.
    Edit

    Here’s a timeline for when mid-Michigan dam construction is expected to be done

    Michigan Live 26 Apr 2025
    The dams were formerly ... Four Lakes Task Force began taking steps to acquire the former Boyce Hydro dams in 2018 after federal energy regulators revoked the Edenville Dam’s power generation license.
    Edit

    Conduct sediment survey to remove silt from Panshet, Varasgaon dams to increase capacity: Vikhe Patil

    The Times of India 26 Apr 2025
    ... said.The water resources minister also directed the officials to check if the existing capacity of hydro-power generation units located at both Varasgaon and Panshet dams could be increased.
    Edit

    FG Reduces MDA Power Debts by 47% Amid 70% Liquidity Growth, 35% Subsidy Cut

    This Day 18 Apr 2025
    As a result, we are working on a hydropower plan for small hydro dams under the Sustainable Power and Irrigation in Nigeria (SPIN) programme.
    Edit

    Waterworks board approves hydro engineering agreement

    Ottumwa Courier 16 Apr 2025
    OTTUMWA — The next phase of the rehabilitation of the Ottumwa Water and Hydro Dam will begin soon ... .
    Edit

    Newest J Pod calf, the fourth Southern Resid ent killer whale born in the last ...

    The San Juan Journal 15 Apr 2025
    HR 2073, the “Defending Our Dams” act, which seeks to protect the dams as a source of hydro-energy at the expense of the salmon population, has been referred to the Subcommittee on Water ...
    • 1
    ×